stretching our limits...
over the last few days, we've been stretching our limits...
with only few days before starting to work, we decided *suddenly* to hire someone to install the laminated floor. It turned out that they can do it over the memorial weekend - so, we go for it.
after a day of wedding for me (and 2 weddings for alex) on saturday, we rushed home and start moving all the stuffs from the 3 bedrooms and hallway closets to our doggie room and dining room and living room. It was pretty messy when we got everything dissembled and moved =P
with only 5 hours of sleep, the installers arrived at 7am on sunday and started their work!
and while they were working hard, we were too -
we worked on the yard a whole day monday - we tried out our new edger and it worked really well. i did the edging while mom and alex did the mowing. after that, mom started trimming the bushes in the backyard, i started mobbing leaves and alex tried removing one of a huge bush that has grown probably 10, 15 feet tall and too wide to have pushed against the fence and the house. what did we end up with is A LOT OF yard waste - and dad started doing the clean-up for us.
by the time we are done - the floor installer were done for the project too ...
so with the remaining energy, i started getting everything back to its place - and finally got the project done around 11pm.
now, i'm all happy with the laminated floor (except that the t-molding's color is not an exact match to the floor itself :( ).
anyhow, whether it's true or it's just a psy - i sneeze less today ;)
with only few days before starting to work, we decided *suddenly* to hire someone to install the laminated floor. It turned out that they can do it over the memorial weekend - so, we go for it.
after a day of wedding for me (and 2 weddings for alex) on saturday, we rushed home and start moving all the stuffs from the 3 bedrooms and hallway closets to our doggie room and dining room and living room. It was pretty messy when we got everything dissembled and moved =P
with only 5 hours of sleep, the installers arrived at 7am on sunday and started their work!
and while they were working hard, we were too -
we worked on the yard a whole day monday - we tried out our new edger and it worked really well. i did the edging while mom and alex did the mowing. after that, mom started trimming the bushes in the backyard, i started mobbing leaves and alex tried removing one of a huge bush that has grown probably 10, 15 feet tall and too wide to have pushed against the fence and the house. what did we end up with is A LOT OF yard waste - and dad started doing the clean-up for us.
by the time we are done - the floor installer were done for the project too ...
so with the remaining energy, i started getting everything back to its place - and finally got the project done around 11pm.
now, i'm all happy with the laminated floor (except that the t-molding's color is not an exact match to the floor itself :( ).
anyhow, whether it's true or it's just a psy - i sneeze less today ;)
0 Comments:
Post a Comment
<< Home